Primary tabs

How-To Note on Preparing a Project-Level Cost Estimate

Comments (0)
Published:
January 15, 2015

This Note is a practical approach to developing a project-level Cost Estimate. 

Update: A correction was made in the appendix of the How-To Note to the description of the USAID policy on evaluation budgeting.

COMMENTS (0)